Projects
A selection of engineering projects across mining, sugar mills, manufacturing, water utilities and ports in Central Queensland. Clients are identified where permitted.
Bowen Basin Conveyor — PLC-5 to ControlLogix Migration
PLC-5 migration on a 7km overland conveyor system during a 4-day planned shutdown. Full logic audit, off-site simulation, and zero commissioning overrun.
Regional Council — Legacy SCADA to Ignition Migration
Full SCADA replacement across 34 pump stations and 2 treatment plants, migrating from an end-of-life Citect system to Ignition with mobile operator access.
Mackay Sugar PLC Migration — 36h Hand-back
Complete PLC platform migration across three mill drives during a 36-hour planned maintenance window. Zero overrun, zero re-work.
Mackay Manufacturer — CompactLogix & HMI from Scratch
Greenfield PLC and HMI installation on a production line that had been running on manual controls. Full system from I/O design through to operator training.
Bowen Basin Mine — OT Network Segmentation & Secure Remote Access
OT network redesign on a Bowen Basin coal operation - flat network segmented into zones, DMZ established, and secure remote access implemented ahead of a principal contractor audit.
Have a project in mind?
Get in touch to discuss scope, timeline and what's involved. We work across Central Queensland.